Value Calculator

What could your IT team finish with fewer interruptions and less rework?

The cost of operating friction is also the commitments that slip, the backlog that keeps growing, and the pressure to hire before the constraint is clear. Model two distinct improvements in paid team capacity, then decide whether either is worth investigating.

Your operating opportunity

See what two modest changes are worth.

Reduce time lost to reactive work. Get more finished from planned work. Set the numbers for your own team.

Choose a view

Recover: time lost to firefighting. Tune up: time lost to friction in planned work. Both: the two added together.

Your assumptions

One team, one starting point. The numbers are yours to change.

20 people
$100,000
30%
2024 survey median: 30% 5+ observability best practices: 21%

New Relic's 2024 survey found that engineering teams spent a median 30% of their time addressing disruptions. Teams reporting five or more observability best practices spent 21%. You don't need to close that whole difference.

New Relic Observability Forecast 2024, pp. 45-46.

New Relic's separate 2026 survey reports 37% of engineering time addressing disruptions.

The study measured disruption time. Include your other reactive work in your own estimate.

5 percentage points

5 points = 2.0 hours per person per week (at 40 hours).

Difference from the 21% reference: 9 percentage points

17%

Include time spent on avoidable handoffs, repeated coordination and rework within planned work, not incident response or waiting while doing other useful work.

Freshworks 2025, across IT, CX, finance and operations: 6.8 hours a week lost to complexity (about 17% of a 40-hour week).

3 percentage points

3 points = 1.2 hours per person per week (at 40 hours).

Recover and Tune up combined

Added output per year, valued at your current labor cost

$160,000

8 points of team time

Each point of team time is worth $20,000 a year.

Five points recovered from reactive work and three points from planned-work friction.

This counts only your IT team's time. The teams that depend on IT gain too, and they are not in this number.


How the improvement adds up

Recover$100,000
Tune up$60,000
Total added output equivalent$160,000

What would you do with the capacity?

+4.2 weeks

of full-team work capacity per year, not project-calendar time saved.

Where might the time be going?

Select what looks familiar. A few recurring operating constraints can consume capacity in more than one place.

Reactive work keeps returning

If requests can jump the queue without a priority decision, then planned work repeatedly gets displaced by whichever issue is loudest.

Planned work takes too long to finish

If no one owns a decision, then the team repeatedly spends time chasing answers, revisiting options and restarting work.

Relevant prior operating result

What better operating control has produced

60% fewer major incidents$22M to $8M stale backlog

Operating control exampleDelivery throughput example

Find the improvements worth making. Then make them.

The IT Operations X-ray finds what is consuming capacity and holding back delivery, then shows which changes are worth making. Execution Leadership helps put those changes into operation when the team needs someone to lead the work.